Maidstone, Kent - Bath/Shower Room

VIP were tasked with completely stripping the bathroom/shower room of a semi deatched house in Maidstone, Kent back to the bone and installing modern furniture with a natural travertine stone finish

1. Before work commenced

The toilet, sink and bath

1. The toilet, sink and bath

The window

2. The window

Downward view of bathroom sink toilet and towel rail

3. Downward view of bathroom sink toilet and towel rail

Vanity unit with shower area reflecting in mirror

4. Vanity unit with shower area reflecting in mirror

Shower/bath area

5. Shower/bath area

2. Room stripped down

Previous wall tiles removed

1. Previous wall tiles removed

Vanity unit and accessories removed

2. Vanity unit and accessories removed

Bath, toilet and sink removed

3. Bath, toilet and sink removed

Chipboard floor and pipework exposed

4. Chipboard floor and pipework exposed

Chipboard floor saturated with water due to recent leak

5. Chipboard floor saturated with water due to recent leak

Room stripped down to joists

6. Room stripped down to joists

3. Preparation completed

Basin waste pipe chase and pipework installed

1. Basin waste pipe chase and pipework installed

Shower three point control valve wall chasing

2. Shower three point control valve wall chasing

Structural ply layers applied

3. Structural ply layers applied

Basin Wall chases filled

4. Basin Wall chases filled

Shower wall pipework completed and chases filled

5. Shower wall pipework completed and chases filled

Structural ply prepared and 6mm ply applied on top to decrease play in floor

6. Structural ply prepared and 6mm ply applied on top to decrease play in floor

4. Installation

P shaped bath installed

1. P shaped bath installed

Wall hung toilet frame and structure installed

2. Wall hung toilet frame and structure installed

Plasterboard applied to wall hung toilet area

3. Plasterboard applied to wall hung toilet area

Wall tiling commences around shower/bath area

4. Wall tiling commences around shower/bath area

Extraction fan and satellite speakers installed

5. Extraction fan and satellite speakers installed

Tiling continues to toilet area

6. Tiling continues to toilet area

Underfloor heating laid

7. Underfloor heating laid

Floor tiling commences

8. Floor tiling commences

Floor tiling completed and grouted

9. Floor tiling completed and grouted

Ivory grout drying inbetween the tumbled travertine tiles

10. Ivory grout drying inbetween the tumbled travertine tiles

New UPVC window installed by third party and tiling completed

11. New UPVC window installed by third party and tiling completed

New vanity unit/sink installed

12. New vanity unit/sink installed

Mirror cabinet and waterproof LED's installed

13. Mirror cabinet and waterproof LED's installed

5. Finished

Shot from top right corner of room

1. Shot from top right corner of room

Vanity unit and accessories removed

2. Vanity unit and accessories removed

Shot from the door at toilet level

3. Shot from the door at toilet level

The shower area

4. The shower area

Bath all in one filler and overflow

5. Bath all in one filler and overflow

Birds eye view of sink and waterfall tap

6. Birds eye view of sink and waterfall tap

Mirror cabinet with touch sensitive lighting on

7. Mirror cabinet with touch sensitive lighting on

Mirror cabinet with LED lighting set to green

8. Mirror cabinet with LED lighting set to green

Wall hung toilet with orange LED lighting

9. Wall hung toilet with orange LED lighting

Waterfall tap with mirror cabinet LED's set to blue

10. Waterfall tap with mirror cabinet LED's set to blue